Flood Control Aluminum Alloy Baffle

Product Details
Customization: Available
Colour: Silvery White
Texture of Material: Aluminium Alloy
Manufacturer/Factory, Other, Group Corporation
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
1000000 RMB
Plant Area
>2000 square meters
  • Flood Control Aluminum Alloy Baffle
  • Flood Control Aluminum Alloy Baffle
  • Flood Control Aluminum Alloy Baffle
  • Flood Control Aluminum Alloy Baffle
  • Flood Control Aluminum Alloy Baffle
  • Flood Control Aluminum Alloy Baffle
Find Similar Products
  • Overview
  • Product Parameters
  • Product lmage
  • Product Description
  • Certifications
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
NF-100
Effect
Control Flood
Height
Customizable
Width
Customizable
Transport Package
Packing in Wooden Cases
Specification
2*1*1
Trademark
Newflag
Origin
China
HS Code
7604299000
Production Capacity
2000square Meter/Mouth

Product Description

 

Product Parameters

Place of Origin Wuxi,China
Product Name Demountable flood barrier
Size H0.2-H5.2M
Surface Treatment Anodized Silver
Product Features Removable Flood Protection
Technics Extrusion,Cutting,Welding
Application Flood Protection
OEM Accept

Product lmage

Flood Control Aluminum Alloy BaffleFlood Control Aluminum Alloy BaffleFlood Control Aluminum Alloy Baffle

Product Description

What is demountable flood barrier?
It is a flood defense system designed in aluminum in modular engineering, being placed at doorway entrance as opening flood barrier to protect house and buildings from the flood risk damage; or being joint together by removable central posts to form an exterior perimeter protection for a private house, commercial property or public utility, diverting water and protecting the area you choose to contain with adjustable flood protection height. It is light weighted to be operated by single adult but in high strength to withstand high velocity water load and greatly bearable with heavy impact forces. And it is partialy pre-installed but most of parts are removable after flood season for minimal visual intrusion to landscape.

It is particularly idea flood prevention solution to area where flood and hurricane prone. It has been proven to be one of the most effective flood control systems with a lot of successful cases adopted by global insurance companies and governments.
Raw Material Aluminum Extrusion & Stainless Steel, Gasket
Length Within 6000mm, designed according to flood height request
Height 200/400/600/800/1000/1200
Panel Thickness T35/50mm
End Post 100-130mm higher than panel stacking height
Gasket EPDM, PE
Application Garage, Parking Lot, Buildings, Shopping Front, Residence Door, Factory Entrance, etc.

Specification:
Features:1. Great water tightness
2. Quick deployment with minor labor work
3. Demountable and removable
4. Visual Amenity
5. Durable Design Life 20-40 years
6. Easy Maintenance


Product Composition:
The product composition can be roughly divided into five parts: Posts (including End Post fixed to the wall, and Removable Central Post attached to the ground), barrier panels, embedding anchors, press-down claps and bolts and seals, as shown in the figure.
 
Please read the demo sketch of system break-down below by with Solidworks engineering
Flood Control Aluminum Alloy BaffleFlood Control Aluminum Alloy BaffleFlood Control Aluminum Alloy Baffle
B.)Removable Central Posts
Removable Central Posts are used to extend the unlimited length of the flood wall by splitting the wall into modules. And with customized angle, the wall can be achieved in turning and cornering. The main body of the Removable Central Posts is extruded by 6063 series and 6005 series aluminum alloy. After aging, the strength of the post is enhanced. It should go through other fabrication such as cutting, welding and anodizing, ect. Each central post can be divided into three parts, the extrusion profile of post, the bottom base and the reinforcing bracket which are machined and welded together. The welding method is extremely important as argon arc welding carried out by skilled welder with certification or auto welding robots, and each welding joint has three layers of welding to secure the strength. Together with the strength of the robust post extrusion profile, it bears the overall load generated by the flood water applied to the aluminum flood wall constructed. Anti-weathering EPDM gasket is installed inside the post to ensure the water tightness between the slot-in barrier panels and the posts. The central post is attached to the embedded anchors which is flush to ground with 8.8 Grade M24 galvanized bolts to ensure its safety and stability. After flood season, the central post can be removed and stored and there is no protrusion on the ground.
Flood Control Aluminum Alloy Baffle
Flood Control Aluminum Alloy BaffleFlood Control Aluminum Alloy BaffleFlood Control Aluminum Alloy Baffle

Certifications

Flood Control Aluminum Alloy Baffle

Company Profile

Newflag Technology Co., Ltd.,

is a young star but professional expert in flood protection solution, located in Wuxi, Jiangsu Province committing to reliable flood mitigation system to control the global flood risk for both civilian flood protection and public water scheme purpose. Our products include Aluminum Demountable Flood Barrier, Glass Wall Flood Barrier, Automatic Flood Barrier, Freestanding Flood Barrier, Steel Flood Gate and so on.
 
WHY WORK WITH US: 1) Affordable Cost: we are in China's most advanced area near Shanghai where investment and technology concentrates, it gives us advantage to compete with products in Europe and America in cost. 2) Reliable Quality: We have had SGS Accreditation for our flood barrier according to British flood protection standard, and are approaching for FM approval and BSI Kitemark for flood abatement products. 3) Quick Delivery: With our hardworking experienced certified welder team as well as our automatic welding robot facility as well as well scheduled production plan, we guarantee every delivery on time. 4) Wide Application: Our products is not only good for civilian flood protection such as personal property, business building, factory front, ect, but also serving the public water schemes in large scales, with our capable experienced engineer team. 5) Quick Response: Our international sales team is serving you 24hours *7 days, any of your demand will have our response within 24 hours. 6) Comprehensive Service: You can enjoy pre-sales consultation, designing, engineering, supervising and constructing and after-sell service by our sales team and our own in-house structural engineering department. 7) Endless Innovation: We are always developing new products to enlarge the product list to solve flood mitigation for all scenarios.
 
Customer relations are characterized by our straightforward and transparent approach to communications. Our main objective is always the satisfaction of our customers, who regard us as a trustworthy partner dedicated to meeting their needs, as well as a trustworthy partner who will always fulfill this trust with new product innovations.
Flood Control Aluminum Alloy Baffle

FAQ

Q: Are these flood barrier system permanent? A: For Demountable Flood Barrier, as the names shows, it is a kind of mobile flood barrier actually, only partial pre-installed (End post), the other parts including the central posts and barrier panel can be removed for storage after flood ends. But once it is deployed on the flood warning, the flood resistance is permanent. For Glass Flood Wall, it is permanently constructed to offer permanent flood protection performance but the glass is still able to be replaced in any case it breaks. For Freestanding Temporary Flood Barrier, it is fully removable without any construction. Q: How do I choose between demountable flood barrier and the Freestanding Temporary Flood Barrier? A: Actually Demountable flood wall is a kind of temporary flood wall as well, because it is only part pre-installed, but it can be removed very easily after flood event to leave almost none visual intrusion to the landscape. Even when it is fully erected, the anodized aluminum appears elegant pleasant and tidy with none visual impact. And it offers definitely much better flood prevention performance than the conventional temporary barriers because temporary flood barrier is mainly for water division and it does not perform as much better as demountable flood barrier in water tightness. So it depends on your performance request. Q: What is the difference between your flood barrier and a permanent flood dam? A: Constructing a permanent dam may be a good idea, but it costs millions of dollars, and the concrete dam will block the eye sight and really a great visual intrusion to local landscape. Comparing in cost, deploying our sectional barriers is a better idea in both cost budget and visual amenity. Q: What is the material of the flood barrier? A: Aluminum Flood Barrier consisted of mainly well engineered argon arc welded aluminum extrusion profile, aluminum beams/barrier panel/stop logs or 3 layer laminated glass panel, with different gaskets including EPDM for posts and panels while PE/PU at bottom to the ground to prevent the water seepage. And it also contains some accessories as anchor plates and pressing tools. And Freestanding Flood Barrier is extruded by ABS plastic.

 
Q: Is this mobile flood wall heavy for operation? A: For metal barriers, it is made of light weighed aluminum, so basically it is easy to operate. For glass wall, it is really heavy because its 3 ply laminated structure if the pane is big and a crane would be required during installation. Q: What is the flood protection height of demountable flood wall system? A: We can produce from 200 to 4600mm as per customer's requirement, the height can be increased or reduced by adding or removing the stop logs/barrier panel in the middle at an every 200mm. For glazing wall, the height will be fixed at design stage from required 400 to 1500mm, but thanks to the exactly same designed posts as the removable flood barrier, extra aluminum beams could be installed right sitting on top of the current glass to increase the flood protection height if any emergency. Q: What is the maximum single span for the mobile flood panels and what is the total length limit? A: It depends on the height, if it is low, the MAX. span can reach 6 meters, but with the height increasing, the designed single span should be reduced accordingly to fit the load requirement for security reason by adding central posts to support. The total length is unlimited by adopting the central posts.
 
Q: What is the maximum single span for glass flood barrier? A: The max size we can offer is H1200*L3000mm or H1500*L2500mm. The total length is unlimited by adopting the central posts. Q: Can the flood barrier be installed with curvature in an arc or for corners? A: At design stage for the special requirement on posts according to the site assessment, both of the frame barrier and the glass floodwall can be fabricated to fit any shapes perfectly including arc, parabolic or angels in any degrees. And for the standard posts, during the sliding of panels into the posts in installation, a 5 degrees of angle is allowed so an arc or curve could be reached together with the increase of central posts if the perimeter is long enough. Q: Will the mobile flood board system require concrete foundations? A: It depends. The end post could be installed on front wall, on side wall or on bottom foundation. But if the opening is quite big and central post should be brought in, then it will need concrete foundation for fixing on the ground. Q: How long will it take to deploy the metal barrier? A: For first time installation, the pre-installed parts will take some time, but after that, against each flood aleart, a team of 5 can quickly deploy a flood wall in length 100meter with the height 1meter within 1 hour. Q: Is the flood wall safe? A: The aluminum extrusion is all well engineered to offer robust and tough performance, it is designed to resist the impact of 20KN/M2. The compressed gaskets stops the water in a very small leakage which is allowed within standard.
 
Q: How can I repair the aluminum flood barrier and what is the warranty? A: Basically the main repair will be the seals/gaskets replacement which is low in cost and could be carried out very easily, and some cleaning and maintenance like stain on surface. The system is with a design life 20-40 years. Q: How do you guarantee the performance of the flood protection system? A: We have a test station for load testing as well as a water tank for leakage test in house. And we have obtained the official test report from SGS according to Britsh Flood Protection Standard PAS1188, and material test report from China National Building Material Test Center. We are also approaching for FM Approval accreditation according to US standard. Q: What extra service do you offer? A: Beside products supply and after-sales service, we can offer very comprehensive and people-orientated service according to the requirement of customers: Pre-sales consultation, AutoCad design drawing in 2D and 3D as per your site plan; Provide installation guidance and instructions, free online consultation throughout the construction process and Training files for your local installation team; Suggestion on storage warehouse location selection; Guidance on plan for flood season alert;
 
Q: Why should I work with you? 1) Affordable Cost: we are in China's most advanced area near Shanghai where investment and technology concentrates, it gives us advantage to compete with products in Europe and America in cost. 2) Reliable Quality: We have had SGS Accreditation for our flood barrier according to British flood protection standard, and are approaching for FM approval and BSI Kitemark for flood abatement products. 3) Quick Delivery: With our hardworking experienced certified welder team as well as our automatic welding robot facility as well as well scheduled production plan, we guarantee every delivery on time. 4) Wide Application: Our products is not only good for civilian flood protection such as personal property, business building, factory front, ect, but also serving the public water schemes in large scales, with our capable experienced engineer team. 5) Quick Response: Our international sales team is serving you 24hours *7 days, any of your demand will have our response within 24 hours. 6) Comprehensive Service: You can enjoy pre-sales consultation, designing, engineering, supervising and constructing and after-sell service by our sales team and our own in-house structural engineering department. 7) Endless Innovation: We are always developing new products to enlarge the product list to solve flood mitigation for all scenarios.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier